Defined Scope
Every removal item, protection requirement and exclusion should be written before work begins.
For properly reviewed non-structural scopes, Punch & Turn can assist with light removal and cleanup so approved finishes and fixtures are taken out, loaded and hauled away.
Every removal item, protection requirement and exclusion should be written before work begins.
Removed material is staged, loaded and secured for transport.
Broom cleanup and visible-condition photos can be included at completion.
Selective removal is quoted by labor, protection, tools, access, debris volume, disposal and cleanup requirements.
Text wide and close-up photos, the job address, material type, access details and deadline for the most accurate initial scope.
Request a Written EstimateThese answers cover the planning details that most often change the scope, access or disposal requirements for this service.
The scope is limited to specifically identified non-structural finishes or fixtures. Structural walls, load-bearing components and engineering-sensitive demolition are not included.
Qualified parties must safely disconnect electrical, plumbing, gas and mechanical connections before removal when those systems are involved. The quote should state what will already be disconnected.
Protection requirements can be reviewed as part of the written scope. Tell us which surfaces, occupied areas or finished spaces must be protected while material is removed and carried out.
Explore closely related scopes when the same project needs more than one type of cleanup, loading, hauling or site support.
See how this service fits the workflow, access requirements and documentation needs of the teams that most often use it.